[1]
K Parameswari et al. 2026. Study on Hybrid XG Boost–LSTM Predictor with a Digital-Twin Monte Carlo Virtual Check for Risk-Aware Scheduling in MSME CNC Manufacturing cluster. International Journal of Computer Information Systems and Industrial Management Applications. 18, 2 (Sep. 2026), 2121–2132. DOI:https://doi.org/10.70917/ijcisim-2026-5486.