[1]
K Parameswari, S Veni, and V.S.Thangarasu, “Study on Hybrid XG Boost–LSTM Predictor with a Digital-Twin Monte Carlo Virtual Check for Risk-Aware Scheduling in MSME CNC Manufacturing cluster”, IJCISIM, vol. 18, no. 2, pp. 2121–2132, Sep. 2026.